Passer aux informations produits
1 de 1

20 Meter Long Lead

20 Meter Long Lead

Prix habituel $28.00 USD
Prix habituel $42.00 USD Prix promotionnel $28.00 USD
En vente Épuisé
Taxes incluses. Frais d'expédition calculés à l'étape de paiement.

This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use.

Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.

Afficher tous les détails