Zu Produktinformationen springen
1 von 1

20 Meter Long Lead

20 Meter Long Lead

Normaler Preis $28.00 USD
Normaler Preis $42.00 USD Verkaufspreis $28.00 USD
Sale Ausverkauft
inkl. MwSt. Versand wird beim Checkout berechnet

This 20 Meter Long Lead is designed with reflective material for increased visibility and is made with strong, durable materials for long-lasting use.

Ideal for long walks or training sessions, this lead provides both safety and convenience for you and your pet.

Vollständige Details anzeigen